Company Information for Minerva Resources plc
Company stock charts - 12 Month chart
Company Statement
Minerva Resources plc (AIM:MVA) is a UK based mineral exploration and development company intent on delivering shareholder value by increasing and developing mineral resources in a socially and environmentally responsible manner.
The main focus of the Company is resource development in Ethiopia, where it has first mover advantage on highly prospective ground on the Arabian-Nubian shield. Key projects include the Tulu Kapi and Gugi gold prospects and the Yubdo Platinum Mine, located in western Ethiopia. .
Minerva Resources was formed in July 2007 through the reverse takeover by Ambrian Capital plc of Palladex plc (admitted to AIM in February 2004) and Ethiopian Resources Limited. The company is progressing the exploration and development of the Tulu Kapi and Gugi gold projects and expanding the small scale Yubdo platinum mine in Ethiopia, operating a Geotechnical Services and Drilling Division in Kyrgyzstan and is a partner in exploration joint ventures for gold, diamonds and platinum in Sierra Leone.
Revenues are derived from the Yubdo platinum mine and the geotechnical services and drilling division.
The Company’s core objective remains the identification and delineation of commercially viable assets capable of driving shareholder value.
Current Operations
Exploration Highlights
Gold
- Tulu Kapi Phase 2 drill, resource definition, programme underway
- Guji Phase 2 drill, resource definition, programme underway
- Dina extensive old workings discovered
Platinum
- In 2001 Minerva Resources, through its subsidiary GPMC, entered into a joint venture with a local entrepreneur, Mr Benti Tassisse (47%), to mine the Yubdo platinum deposit.
Diamonds
- In Sierra Leone Minerva Resources retains a minority interest (24.5%) in the Lake Sonfon Diamond Project
The key activities are:Tulu Kapi Gold Project, Ethiopia (100% Minerva Resources)
The Tulu Kapi Exploration Licence comprises an area of approximately 20 square kilometres centred on the old Tulu Kapi gold mine. Tulu Kapi is 9km south of Keley, a small village on the main Gimbi to Dembi Dolo road, 500km west of Addis Ababa. There is abundant water in the region, and good road acces and a high power transmission at Keley. The area is surrounded by the Yubdo Exploration Licence Area.
Following a re-interpretation of the structural controls of mineralisation in 2006, drilling by Minerva Resources intersected significant gold mineralisation in four holes with a best intersection of 37.9m at 4.61 g/t gold (1.58 g/t when a top-cut of 31.1g/t gold is applied). Mineralisation is hosted in proterozoic syenites and associated with zones of hydrolytic hydrothermal alteration centred on a NNE shear.
The UNDP work demonstrated anomalous gold grades continue for 1.2km along the shear structure, but Minerva Resources is focusing on a 600m section that is oriented northwest-southeast. Seven Phase 1 drill holes have to date delineated two dominant hydrothermally altered zones that dip to the southwest. The upper zone is over 20m thick, and the lower zone is over 10m thick. Phase 2 drilling is designed to test the grade, and the depth and strike continuity of these altered zones.
Gugi Gold Project, Ethiopia (100% Minerva Resources)
Guji is a greenfield evaluation target within the Yubdo Exploration licence area discovered by the Minerva Resources geological team. Guji is only seven kilometres west of Tulu Kapi, enabling significant sharing of logistics and infrastructure.
Discovered through regional spur soil sampling, follow-up rock chip sampling and soil geochemistry, Guji is hosted in a suite of proterozoic metasediments and metavolcanics. Guji lies on a major NNE shear and the heavily deformed rocks have permitted an extremely deep (40-50m) weathering profile to develop.
The principal target is a 1.2km x 200m soil geochemistry anomaly and assays from trenching and three 100m boreholes are awaited. Encouraging alteration features in the core have prompted Minerva Resources to plan a 3,000m Phase 2 drill programme for Q3 2007.
Yubdo Platinum Mine, Ethiopia (51% Minerva Resources and Management)
The Yubdo platinum mine was a small scale artisanal working when the former Golden Prospect Mining Company (Ambrian Capital plc) assumed management from a local entrepreneur in mid 2005. It is the sole platinum producing company in Ethiopia. The Yubdo Mine is 520km almost due west from Addis Ababa. Yubdo village and the mine site have recently been connected to the grid and an digital telephone centre is under construction in the village.
In 2006 Minerva Resources carried out a programme of pitting over the ridge above and to the southwest of the present small-scale mining operation southeast of Yubdo village, in order to estimate the resource in this small area.
Based on the results of the pitting GPMC has used a polygonal method to estimate a resource of 23,760 ounces (793kg) of platinum in 1,470,000 tonnes of laterite material with an average grade of 0.54g/t platinum within the limited area covered by the pitting programme. Importantly, the average grade of the laterite below a barren 1.5m soil layer was 0.82g/t platinum. The pitting programme also indicated that both laterite thickness and platinum grades are lower over the ridge area than on its flanks. Geological mapping shows that potentially mineralised laterite extends along strike for several kilometres on the Yubdo ultramafic intrusion.
Mapping of bedrock exposed in the pitting and in outcrop shows fractures containing quartz-carbonate with pyrite in the form of boxworks and planar fracture fillings occurring in zones trending east of north with generally steep westward dips, cutting the serpentinised dunites and pyroxenites of the Yubdo Ultramafic Complex. Pit sampling shows PGM values in this material relative to fresh rock which support the contention that PGMs are concentrated by hydrothermal action associated with zones of fracturing.
York Platinum, Sierra LeoneThe York Peninsular Platinum Project is based on the Freetown Intrusion, a large layered basicultrabasic body that has been the source of historical alluvial platinum production, and has similaritiesto the Bushveld Intrusion of South Africa. A two-metre thick horizon with anomalous platinum values can be traced over a strike length of 8.5 kilometres. Rock and soil samples from weathered bedrock,assayed up to 0.84 g/t Pt.
The York Platinum project is a joint venture with Jubilee Platinum plc, operated by Jubilee Platinum. Minerva Resources’ interest under the York JV is currently 80%.
Lake Sonfon Diamonds , Sierra Leone: The Lake Sonfon diamond licence in Sierra Leone is run by Mano River, the Joint Venture partner.
In Sierra Leone Minerva Resources retains a minority interest (24.5%) in the Lake Sonfon Diamond Project, operated by Manor River Resources Inc. Mano River Resources Inc. has announced that reconnaissance work has confirmed the presence of macro-diamonds, one of which is classified as a clear white octahedral gemstone weighing 0.315 carats, and of kimberlite indicator minerals, within the Lake Sonfon JV area.
Geographical Spread
Ethiopia, Sierra Leone, Kyrgyz Republic
Board of Directors and Key Management
| Terry Ward | Managing Director
|
| Andrew Daley | Non-executive Chairman
|
| John Bottomley | Non-executive Finance Director and Company Secretary
|
| Robert Edwards | Non-executive Director
|
| Roger Clegg | Non-executive Director
|
|
|
| Senior Management Team
|
| Dr. Kebede Hailu Belete | Chief Geologist and General Manager
|
| Rashid Jaboev | General Manager, Technical Services Division |
Company Address
5th Floor
Manfield House
1 Southampton St London, United Kingdom WC2R 0LR
|
| Additional Address/Key Contact
Registered Office One America Square Crosswall London EC3N 2SG United Kingdom |
Capital111.7m shares on issue
|
Nominated Brokers
WH Ireland, London, UK | | Nominated AdvisorsWH Ireland, London, UK |
Broker/Analyst Reports
12/09/07 - t1ps Report
Major Shareholders
| Name of Shareholder | Quantity | %
|
| Ambrian Nominees Limited | 44,500,000 | 39.8%
|
| Pershing Keen Nominees Limited | 9,852,648 | 8.82%
|
| Mr Merlin Marr-Johnson | 4,200,000 | 3.76%
|
| L R Nominees Limited | 4,110,954 | 3.68%
|
| HSBC Global Custody Nominee (UK) | 3,500,000 | 3.13% |
Related News
08/07/08 -
Minerva Resources Is More Advanced With Its Gold, But Longer-Term Platinum May Turn Out To Be The Company Maker 12/11/07 -
Minerva Resources Generates Some Excitement In Ethiopia25/07/07 -
Minerva Resources Starts A New Life With Cash, Cash Flow And Exploration Potential
Most Recent Statement
12/11/08 -
Drilling Report: Exploration Update - Tulu Kapi Gold Project, Ethiopia03/11/08 -
Total voting rights23/10/08 -
Exploration Update - Dina Gold Prospect, Ethiopia17/09/08 -
Placing raises £607,50001/09/08 -
Exploration Update - Tulu Kapi Gold Project, Ethiopia04/08/08 -
Exploration Update - Tulu Kapi Gold Project, Ethiopia