Baobab Resources

Find out more about Subscribing Companies
Unique access to energy
investors. Global distribution
of company news.
Find out more.
Sign up for our free weekly newsletter
Informed comment and independent news delivered
by email every week.
Sign up here.
Find out more about Minesite Forums
Management and investors
are brought together at our
investor forums.
Find out more.
Bulletin Board
Join other informed investors.
Debate mining companies.
Visit Bulletin Boards.
OPUS Executive
An Insider's Guide to the Mining Sector, 2nd edition
The Austmine 2009 Conference & Exhibition
T1ps Spreadbetting
HighGrade.net
Commodity Watch plc - holding company of Minesite
Asia Mining Congress 2009
Commodity Watch Radio
Jobs4mining
Exchange Traded Gold
UNCTAD
Ocean Equities Ltd
Terrapinn Commodity Investment World
Bullion Desk
allipo.com
Doug Casey Research
Ambrian Capital

Company Information for Toledo Mining Corp Plc

Company stock charts - 12 Month chart

Exchange AIM; TMC


View full financial data

Company Statement

Toledo Mining Corporation plc is a mining company focused on nickel exploration and development in the Philippines. It has significant interests in three nickel laterite projects (Berong, Celestial and Ulugan) on Palawan in the Philippines.

Toledo Mining is listed on the AIM market of the London Stock Exchange.

The company has a 56.1% interest in the Berong Deposit (comprising the Berong, Moorson, Long Point and Ulugan deposits) which has a combined pre-JORC resource of approximately 275 million tonnes of nickel ore.  The company also has interests in Celestial – a laterite property – which has a pre-JORC resource of approximately 75 million tonnes of nickel ore.
 Toledo was incorporated in England (Registration No: 5055833) in February 2004 and listed on London’s AIM market in April 2004. The Company interests are held in the Philippines.

Toledo has a Head Office is in London with a second office in Manila, where the CEO is based, from where the projects on the island of Palawan are run.

Key Highlights

  • Temporary Exploration Permit (TEP) granted on 15th November 2005. Commenced test pitting, drilling, sampling, GPR, topographical survey.
  • Environmental Clearance Certificate (ECC) granted on 14th June 2006
  • Priority Project Status granted in October 2006
  • Special Mines permit granted in November 2006
  • Trial metallurgical shipments commenced January 2007
  • Extension of Mining Permit granted on 05 June 2007


Current Operations

Berong Nickel
Toledo Mining is focused solely on nickel laterite deposits in the Philippines.

Initial activities are centred on developing a direct-shipping laterite operation at Berong, whereby the ore will be sold FOB Philippines to nickel smelters.

The company has an economic 56.1% interest in the Berong, Moorson, Long Point and Ulugan deposits (referred to collectively as the Berong Deposit), all on Palawan Island, which have a combined pre-JORC resource of approximately 275 million tonnes of nickel ore at around 1.3% nickel (ni). The company also has interests in an additional laterite property, Celestial which has pre-JORC resource of approximately 75 million tonnes at around 1.25% nickel.

Both Berong and Celestial deposits total a combined, pre-JORC resource of some 350mt@1.3%Ni.

Current status
A long term laterite ore Supply Agreement has been signed with Queensland Nickel Pty Ltd, a BHP Billiton group company.  The laterite ore will initially be shipped from the Company’s operations at Berong to QNPL’s Yabulu Refinery in North Queensland, Australia.  The Supply Agreement is for a 5 year term with an option to extend for a further 5 years at the election of QNPL.  Project activities completed include the coastal stockpile drying pad area and associated siltation management system, the assay laboratory and the potable water systems. Designs and costings were completed for the permanent offices, accommodation village, crusher and batch plant facilities, workshop facilities, Dangla Road, Berong airstrip upgrade, and the pedestrian bridge over the Berong River. The design of the trestle conveyor and alternative ship loading options continue.

Permit approvals continue to delay the start of construction of the Dangla Road, a dedicated haul road without community development along its route.

As previously reported, the Company entered into a Mineral Production Sharing Agreement [MPSA No.235-2007-IVB] with the Philippine Government covering the 288 hectare Berong Nickel Project. The current Direct Shipping Operation falls under the MPSA and the associated Special Mines Permit. The Feasibility Study Report for the life-of-mine operations is currently being prepared for submission to the Department of Environment and Natural Resources to enable the “Declaration of Mining Feasibility” for this MPSA area.

A JORC compliant mineral resource was prepared by Snowdens Mining Industry Consultants and released to the market. The measured, indicated and inferred resource within the 288 ha MPSA area is estimated at 9.92 million tonnes at an average grade of 1.55% Ni using a 1% nickel cut-off grade. Drilling within the MPSA area is ongoing and is aimed at delineating additional tonnage.

The assessment of processing options to add value to the large lateritic resources at Berong continued. SNC Lavalin is undertaking this work, and samples of the various ore types have been selected and are ready for shipment to the testing laboratories. Processing options being considered are high pressure acid leaching, atmospheric leaching, heap leaching, ferro-nickel smelting and the Chinese nickel pig iron process.

Celestial/Ipilan
The Company’s Celestial nickel laterite property, also on Palawan Island, covers an area of 2,835 hectares, and has substantial permitting already in place. The Company will earn a 52% economic interest in this project, with the right to increase this to 71.2% through future payments.

Acid leach metallurgical test work has been conducted on the property and a pre-feasibility study has demonstrated economic viability, subject to more detailed work being carried out for a bankable feasibility study. The property has been well explored, yielding a current resource estimate of 77 million tonnes of 1.25% nickel and 0.10% cobalt within an area of 800 hectares.

Current status
Field exploration and evaluation activities continued,  with excellent progress being made. Drilling continues to be used where the ore body is too deep for hand pitting. To date, approximately 300 hectares of mineralisation has been drilled or test pitted on a grid spacing of 25meters x 25 meters to an average thickness of between 15 meters to 20 meters. This would indicate more than 60 million tonnes of laterite nickel mineralisation within a small footprint. This is more than sufficient for an initial direct shipping operation to be followed by value added processing on site. A JORC compliant ore resource estimate is expected to be released before year end.

Project activities are being directed towards those activities which would allow the early development of the project into a Direct Shipping Operation. These activities include detailed topographic surveys together with test pit and drill hole locations, seeking expressions of interest from engineering contractors for the scoping and costing of the infrastructure facilities, initiating the tree inventory count for the project areas likely to be mined, scoping of the marine bathymetric surveys, and preliminary ore body modelling and mine designs. Planning is being undertaken on an initial 1.5 million wet metric tons per year operation.

Metallurgical testing of the ore types is currently being undertaken in conjunction with the testing programme being performed on the Berong ore types. The ore types are expected to show characteristics suitable for acid leaching or the Chinese blast furnace process for producing nickel pig iron.

Ulugan Nickel
The Company owns a 58% economic interest in the Ulugan Nickel project. This deposit is also located on the island of Palawan and consists of two Exploration Permit applications covering more than 16,000 hectares. Pending granting of the Exploration Permits little work has been undertaken on this property.

Current status
Due to the May 2007 elections and social issues, the processing of permit requirements around the Puerto Princesa area [Ulugan Area] has been delayed.


Geographical Spread

The Philippines


Board of Directors and Key Management

George Bujtor Chief Executive Officer
Reginald Eccles Chairman
Felix Pole Director
Simon Purkiss Director

Company Address

Ground Floor
Finova House
11 Albemarle Street
London, United Kingdom W1S 4HH

Telephone:020 7514 1480
Facsimile:020 7514 1486
Website:http://www.toledomining.com

Additional Address/Key Contact

Philippines
Third Floor, PhilAm Building100 C. Palanca Street cor. Dela Rosa StreetLegaspi Village, 1229Makati City Metro ManilaThe PhilippinesT:  + 63 2 817 7104F:  + 63 2 817 2357E: info@toledomining.com

Capital

Total shares in issue 29,538,333

Annual General Meeting

October

Year End

March

Nominated Brokers

Ambrian Partners Limited
Old Change House
128 Queen Victoria Street
London
EC4V 4BJ
Tel: +44 (0)20 7634 4700
Fax +44 (0)20 7710 4701

Nominated Advisors

Ambrian Partners Limited
Old Change House
128 Queen Victoria Street
London
EC4V 4BJ
Tel: +44 (0)20 7634 4700
Fax +44 (0)20 7710 4701

Major Shareholders

European Nickel PLC19.3%
RAB Energy Fund Limited9.2%
AXA SA9.1%
TPG-Axon Capital Management LP6.5%
FMR LLC5.2%
Baker Steel Capital Managers LLP4.9%
Barclays PLC4.9%
The Throgmorton Trust PLC4.7%
Mr Alfredo Ramos4.4%
MF Global UK Limited3.9%
Man Financial Limited3.9%

Related News

11/12/08 - With Chinese Backing, George Bujtor Gets Toledo Mining Into Position For A Long Haul Through Serious Weakness In Nickel
01/10/08 - Toledo Mining Is Well Positioned To Ride Out The Storms In The Market, Even With Nickel At Under $16,000 Per Tonne
08/05/08 - Toledo Mining Starts To Get Serious About Downstream Nickel Production
24/05/07 - Toledo Mining Ships Nickel Ore Directly To China

Most Recent Statement

24/12/08 - Interim Results for the six months period ended 30 September 2008
04/12/08 - INITIAL JORC RESOURCE ESTIMATE FOR THE IPILAN NICKEL PROJECT, PHILIPPINES
11/11/08 - Operations Update
07/10/08 - Positive Results from the Berong Heap Leach Concept Study
30/09/08 - Toledo Mining Corporation plc Appoints New Non-Executive Director
28/08/08 - Toledo signs MOU with Chinese Jiangxi Group for a Demonstration Nickel Leach Plant at Berong in the Philippines

To top