Chromex Mining plc (AIM: CHX) is an AIM quoted dedicated chrome company established to acquire, control and develop chromite mining and processing facilities.
It currently has two key mining assets located on the Bushveld Complex in South Africa, which between them have total resources of approximately 41 million tonnes of chromite.
Mecklenburg – Eastern Limb
- 9.6Mt underground resource with a bankable feasibility study completed in March 2007, New Order Mining Right
Stellite Project – Western Limb
- 31.9Mt opencast and underground resource with a New Order Mining Right Commenced production July 2008
Chromex is focused on growing its current resource base with near production projects to supply beneficiated chrome products into the ferrochrome and stainless steel markets. In addition the Company continues to review additional prospects.
Current Operations
Stellite
The 271 hectare Stellite chrome project, located on the Western Limb of the Bushveld complex in South Africa, has a New Order Mining Right and 31.9Mt of chrome resources comprising four seams, namely the LG6, MG1, MG2 and MG4. All four seams outcrop on the property and it’s anticipated that circa three million tonnes will be open cast. The project has been extensively drilled and has had approximately 170,000 tonnes of chromite mined and sold both to the domestic and international chrome markets.
Chromex commenced producing run-of-mine (‘ROM’) chrome ore in July 2008. Chromex is constructing a 40,000 tonne per month beneficiation plant which will produce metallurgical, chemical and foundry grade sands. The plant is expected to be completed and commissioned during the second quarter of 2009. Output at the mine has been significantly reduced due to market conditions and is expected for the short term to be producing approximately 10,000 tonnes per month of beneficiated chrome sands once commissioned.
STELLITE MINERAL RESOURCES* |
Chromite Seam | Opencast | Underground |
Tonnes (mt) | Cr2O3 (%) | Cr:Fe | | Tonnes (mt) | Cr2O3 (%) | Cr:Fe | |
LG6 & LG6a | 0.83 | 40.1 | 1.47 | Inferred | 11.79 | 40.1 | 1.5 | Inferred |
MG1 | 1.09 | 39.8 | 1.38 | 3.63 | 39.8 | 1.38 |
MG2-MG4 | 4.78 | 36.3 | 1.31 | 9.80 | 36.3 | 1.31 |
Total | 6.70 | 37.3 | 1.34 | | 25.23 | 38.6 | 1.4 | |
*Total resources controlled by Chromex
Mecklenburg ProjectChromex has a New Order Mining Right over the Mecklenburg farm in the Limpopo Province, South Africa, where it intends to mine chromite. Mecklenburg is located on the Eastern Limb of the Bushveld Complex, well known for hosting much of the world’s known resources of platinum, but also a major source of chromite. The LG-6 and LG-6A chromite reefs, which outcrop at surface at Mecklenburg, comprise approximately 9Mt and 5.7Mt of chrome resources and reserves respectively. Once regulatory issues have been resolved and market conditions improve Chromex intends to mine this resource over a 10 year period with a target production rate of 60,000 tonnes per month of underground run of mine ore.
MECKLENBURG MINERAL RESERVES & RESOURCES* |
U/G RESOURCES | U/G RESERVES |
Tonnes (mt) | Cr2O3 (%) | Cr:Fe | | Tonnes (mt) | Cr2O3 (%) | Cr:Fe | |
3.24 | 43.8 | 1.7 | Measured | 3.15 | 27.0 | 1.7 | Proven |
2.62 | 43.7 | 1.7 | Indicated | 2.53 | 27.0 | 1.7 | Probable |
3.19 | 41.7 | 1.7 | Inferred | | | | |
9.05 | 43.0 | 1.70 | | 5.68 | 27.0 | 1.7 | |
* Total resources controlled by Chromex
The LG-6 Units are the most important chromite targets in the Bushveld Complex as they combine both the the highest grades and uniform thickness. Analytical results from the LG-6 and LG-6A chromite layers substantiate the geochemical continuity known throughout the explored area and indicate that the chromium grade is similar to that being mined elsewhere in the Bushveld Complex.
It is anticipated that a moderate percentage of the ore will remain as coherent blocks or fragments producing a product called lumpy ore, the preferred product for supply to smelters. Other mines close to Mecklenburg have produced up to 40% lumpy ore. Given the physical test-work from the trial mining exercise it is anticipated that lumpy production from a mining operation could be at a similar level.
Importantly, the project’s location allows the mine to tap into the current water, electricity and tailings infrastructure from Anglo Platinum’s Twickenham mine.
Geographical Spread

Chromex’s projects are located on the western and eastern limbs of the Bushveld Complex in South Africa where in excess of 70% of the worlds chrome resources are located and 40% of chrome production is sourced.
Board of Directors and Key Management
| Brian Moritz | Executive Chairman
|
| Russell Lamming | Chief Executive
|
| Nigel Wyatt | Executive Director
|
| Vusimuzi Nkosi | Non-executive Director
|
| James Burgess | Non-executive Director
|
| Robert Sinclair | Non-executive Director
|
| Phoevos Pouroulis | Executive Director |
Company Address
36 Dover Street London, United Kingdom W1S 4NH
|
| Additional Address/Key Contact
South Africa Eland House The Braes 3 Eaton Road Bryanston
Tel: +27 11 317 1701 Fax: +27 11 463 4759 |
CapitalSecurities in Issue
Issued Shares 85,002,650
Warrants 6,868,523
Options 2,300,000
Total 94,171,173
|
Nominated Brokers
Astaire Securities Plc
30 Old Broad Street
London EC2N 1HT
Ocean Equities Ltd
3 Copthall Avenue
London EC2R 7BH | | Nominated AdvisorsAstaire Securities Plc
30 Old Broad Street
London EC2N 1HT |
Major Shareholders
| FOREST NOMINEES LTD | 38.8%
|
| HSBC GLOBAL CUSTODY NOMINEE (UK) LTD | 8.5%
|
| REDMAYNE (NOMINEES) LTD | 5.9%
|
| MORITZ | 5.9%
|
| LYNCHWOOD NOMINEES LTD | 5.0%
|
| VIDACOS NOMINEES LTD | 3.9% |
Related News
18/03/09 -
The Chrome And Ferrochrome Markets May Be Shot To Pieces, But Chromex Mining Remains Resolutely Cash Flow Positive07/01/09 -
Chromex Keeps Its Head Above Water With New Plans For The Stellite Chromite Mine09/10/08 -
The Rating Of Chromex Mining Reflects Acceleration In Both Production And Cash Flow19/05/08 -
Chromex Closes One Acquisition But Is Still Waiting On The Courts Before It Can Get To Work On Mecklenburg
Most Recent Statement
03/06/09 -
Interim Results24/03/09 -
Final Results16/03/09 -
PGM and Gold Mining Rights awarded on Stellite Mine29/01/09 -
Off-take MOU Signed for Sales of Chrome Ore at its Satellite Project 06/01/09 -
Market Update and Loan Facility01/12/08 -
Result of EGM